skip to content

Posts Tagged 'Refurbishment'

Chiltern Rail refresh the look of class 165 fleet with help from Stewart Signs Rail

25 October 2011 at 11:39

When Chiltern Rail needed to refresh the look of its entire Class 165 fleet, one of their key goals was to revitalise the passenger environment and internal paintwork, which after many years of service and consistent traffic of passengers, had begun to look tired and dated.

Realising that fully repainting the 89 units wouldn't achieve the significant refresh results in a tight 3 day timescale and offer a long term solution to wear and tear, Chiltern opted for a three stage system of heavy cleaning, local paint repairs and application on all painted surfaces of advanced protective and surface revitalising solution, ChelaGuard®.

Clearcoating ChelaGuard® onto the newly cleaned surfaces helps to lock in the revitalised finish and ensures the surfaces are resistant to marking and graffiti, easier and quicker to clean and the high gloss finish creates a much brighter and fresher look for the Class 165's bringing them in line with the newer units on the fleet.

If you would like to know more about the Stewart Signs refurbishment and protective solutions for rolling stock contact us or visit our Chelaguard® page to learn more.

 

 

Tags: Anti Graffiti | Rail | Protective coating | livery | refurbishment | | Chelaguard

Posted in Rail | No Comments

Bombardier and Halo Rail collaborate for London Overground renewal project

26 September 2008 at 00:00

Bombardier Transportation and Halo Rail has recently completed the first new Class 378 Electrostar units for the London Overground network. The initial project, to complete a total of 24 3-car ... [ read more ]

Tags: Rail | Refurbishment

Posted in Rail | No Comments

Interior livery refurbishment the ideal solution for Virgin

29 August 2008 at 00:00

  When Alstom, the company who built and maintain the Pendolino fleet for Virgin sought a more cost effective solution to keep high traffic interior areas of rolling stock in top ... [ read more ]

Tags: Refurbishment | Rail | Internal

Posted in Rail | 1 Comments »

New look for Networkers

07 February 2007 at 00:00

On Wednesday 6th February 2007 Southeastern held a celebration at their Slade Green depot to mark the end of a major 2-year project to restore the interiors of 155 class 465/466 Networker ... [ read more ]

Tags: Labels | Refurbishment | Rail

Posted in Rail | No Comments